Jio Postpaid Signal and Quality is very bad

Dear Jio,

I am a Sbi branch manager at Unnao. This is to inform you that I am facing Jio network issue at my residence ie. MIG 8, sector D, PD nagar, unnao behind Bhavyashika hospital. Kindly do something with urgency.

I have complained so many times, but there is no any resolution from JIO. Please port my number into Airtel immediately…

Reagrds

Branch manager
Name-Ankur kumar
Mobile no-8429532650

UTKAL UNIVERSITY Exam system

ପାଠ ପଢା ହୋଇନି।ପ୍ରାକ୍ଟିକାଲ କଣ ପିଲାଙ୍କୁ ଜଣାନାହିଁ।କମ୍ପୋଜିଟ କଲେଜରେ କ୍ଳାସ୍ ହୋଇନି କହିଲେ ଭୁଲ୍ ହେବନି। ପିଲାମାନେ ଯେତେବେଳେ କଲେଜ ଆସିଲେ ତାଙ୍କୁ କୁହାଗଲା, ପରୀକ୍ଷା ଚାଲିଛି ।ମାସ ମାସ ଧରି ଚାଲିଲା +୨ ପରୀକ୍ଷା ।ତାପରେ 6th ସେମିଷ୍ଟାର୍ ପରୀକ୍ଷା ।ଏମିତି କଟିଗଲା ଫେବୃୟାରୀ ଆଉ ମାର୍ଚ୍ଚ ମାସ। ଏପ୍ରିଲ ମାସରେ ଅଧ୍ୟାପକଙ୍କ ଇଲେକ୍ସନ ଡ୍ୟୁଟି,ଆଉ ଖାତା ଦେଖା। +୨ର ପରୀକ୍ଷା ପରିଚାଳନା ,ତାପରେ ମାସାଧିକ କାଳ ଖାତା ଦେଖାରେ ବ୍ୟସ୍ତ ରହି
େ ଅଧ୍ୟାପକ କର୍ମଚାରୀ ।ଏବେବି ଖାତା ଦେଖା ଚାଲିଛି ।କମ୍ପୋଜିଟ କଲେଜ ଗୁଡିକରେ, ଯେଉଁଠି ଯୁକ୍ତ ଦୁଇ ଯୁକ୍ତ ତିନି ମିଶି କରି ରହିଛି, ସେସବୁ କଲେଜରେ +୩ର ଛାତ୍ର ଛାତ୍ରୀଙ୍କ ସ୍ୱାର୍ଥକୁ ଅଣଦେଖା କରାଯାଉଛି। ପ୍ରଥମେ 5th ସେମିଷ୍ଟାର ଖାତା ଦେଖାରେ ସମୟ କଟିଲା। ଏବେ ପୁଣି ଯୁକ୍ତ ୨ ଖାତା ଦେଖାରେ ଅଧ୍ୟାପକ ମାନେ ବ୍ୟସ୍ତ ।ମାତ୍ର ଦଶ ବାର ଦିନ କଲେଜ ହତା ମାଡିଛନ୍ତି ପିଲେ।ବହି ଓଲଟାଇବାକୁ ସମୟ ନାହିଁ ।ମିଡ୍ ସେମିଷ୍ଟାର ପରୀକ୍ଷା ଚଳିତ ମାସ ଶେଷ ସୁଦ୍ଧ ଅନେକ କଲେଜରେ ସରୁଛି।ସରକ!
ାର ସର୍ବଦା ଗୁଣାତ୍ମକ ଶିକ୍ଷା କଥା କହୁଛନ୍ତି।ବହି ନ ପଢି,ଗୋଟିଏ ହେଲେ ପ୍ରାକ୍ଟିକାଲ ନକରି ଏବେ ଉତ୍କଳ ବିଶ୍ୱବିଦ୍ୟାଳୟ ତା ଅଧିନସ୍ଥ ଡିଗ୍ରି କଲେଜ ଗୁଡିକର ପିଲାମାନଙ୍କୁ 4th ସେମିଷ୍ଟାର୍ ପରୀକ୍ଷା ଦେବାକୁ ବାଧ୍ୟ କଲା। 6th ସେମିଷ୍ଟାର ପିଲାମାନଙ୍କ କ୍ଷେତ୍ରରେ ମଧ୍ୟ ଠିକ ଏମିତି ହୋଇଥିଲା।ପାଠ ପଢା ହୋଇନି, କିନ୍ତୁ ପିଲାଙ୍କ ପରୀକ୍ଷା ହେଲା। ତେବେ ଏ କି ପ୍ରକାର ଗୁଣାତ୍ମକ ଶିକ୍ଷା? ଆଜି ପୁଣି ( ତା୨୦-୪-୧୯ରେ) ପରୀକ୍ଷା ନିୟନ୍ତ୍ରକ ଏକ ବିଜ୍ଞପ୍ତ
ଜାରୀ କରିଛନ୍ତି। 4th ସେମିଷ୍ଟାର ପିଲାଙ୍କ ପରୀକ୍ଷା ପ୍ରୋଗ୍ରାମ ବାହାରିଛି।ମେ ମାସ ୪ ତାରିଖ ରୁ ୧୦ ତାରିଖ ଯାଏ ପରୀକ୍ଷା ଚାଲିବ ବୋଲି କୁହାଯାଇଛି।ପ୍ରୋଗ୍ରାମ ଦେଖି ଛାତ୍ର ଛାତ୍ରୀମାନେ ସ୍ତବ୍ଧ ହୋଇଯାଇଛନ୍ତି।କିଛି ନ ପଢି କେମିତି ପରୀକ୍ଷା ଦେବେ, ଏଇ ହେଉଛି ସେମାନଙ୍କ ଅଭିଯୋଗ । ପିଲାମାନଙ୍କ ଭବିଷ୍ୟତ ସହ ଖେଳା ନ ଯାଉ। ମହାମହିମ ରାଜ୍ୟପାଳ,ବିଭାଗୀୟ ଶାସନ ସଚିବ ତଥା ଉଚ୍ଚଶିକ୍ଷା ବିଭାଗର ନିର୍ଦ୍ଦେଶକ ତୁରନ୍ତ ଘଟଣାଟିକୁ ସହୃଦୟତାର ସହ ବି ାର କରି ଛାତ୍ର ଛାତ୍ରୀମାନଙ୍କ!
ୁ ତୁରନ୍ତ ନ୍ୟାୟ ପ୍ରଦାନ କରନ୍ତୁ ।ଏବେ ଅନେକ ଅଧ୍ୟାପକ ମାନେ ସାଧାରଣ ନିର୍ବାଚନ କାର୍ଯ୍ଯରେ ବ୍ୟସ୍ତ । ପ୍ରଚଣ୍ଡ ରୌଦ୍ରତାପ ପାଇଁ ସରକାର ଯୁକ୍ତ ୨ କଲେଜ ଗୁଡିକୁ ଇତିମଧ୍ୟରେ ଛୁଟି କରି ଦେଇଛନ୍ତି ।ଡିଗ୍ରି କଲେଜ ଗୁଡିକ ମେ ୭ ରେ ଛୁଟି ହେଉଥିବା ବେଳେ 4th ସେମିଷ୍ଟାର ପରୀକ୍ଷା ମେ ୧୦ ଯାଏ କରିବା ଆଦୌ ଠିକ ନୁହେଁ ବୋଲି ଅନେକଙ୍କ ମତ।ପାଠ ପଢିବାକୁ ପିଲାଙ୍କୁ ପର୍ଯ୍ୟାପ୍ତ ସମୟ ଦେବା ଉଚିତ ।ନିଜ ଦାୟିତ୍ବ ସରିଯିବ ବୋଲି ଭାବି ପିଲାମାନଙ୍କ ଭବିଷ୍ୟତକ
ଆଉ ଅନ୍ଧାର ଭିତରକୁ ଠେଲି ନ ଦିଆ ଯାଉ।ମାନ୍ୟବର ମହାମହିମ ରାଜ୍ୟପାଳ ତୁରନ୍ତ ଏଥିରେ ହସ୍ତକ୍ଷେପ କରନ୍ତୁ।ଗ୍ରୀଷ୍ମ ଛୁଟି ପରେ ଯାଇଁ ୪ର୍ଥ ସେମିଷ୍ଟାର ପରୀକ୍ଷା କରନ୍ତୁ ।

RATION CARD Pending of. Application

Sir,Mam

I bed to say that I apply for ration card on 11 July 2015 on site online ,but till now I my application status was on pending what I fo now I am poor man and cannot buy wheat ,rice from store at higher price ,so please done my application so I can get my food from ration store my application number is 990016606.

Thanks
Rakesh (son of applicant )

Mangalore City Corporation Water Supply

I am a resident of Pinto Garden, Opp to Vikas PU Colleeg, Maryhill.
A family who resides in Nirmala Nivas, Pinto Garden has installed an unauthorized water wall to the city corporation water pipe in front of their house due to which we are facing huge water scarcity crisis. Please help in resolving this issue as soon as possible.

NAGAR NIGAM MATHURA SEWAGE & DRAINAGE ISSUE

To
Mayor Mr. Mukesh Arya Bandu
Nagar Nigam Mathura,

I Myself Ghanshyam Chaturvedi Staying at Joshi Baba Gali, Swami Ghat Mathura having the complaint regarding the work done by your staff at our place for restructuring the sewage pipelines for this they had opened up entire sewage chamber in the Gali due to which they have spoiled entire structure of the Street(i.e) Gali. and after opening of all the sewage chambers they have not closed them properly which makes entire area environment unhygienic. Apart from this do they open all the pipelines are they are not responsible to close it off. Because they had not closed it properly the Rain Water is getting inside to the Houses Basement which result into the Big Wall Cracks inside the home structure. Due to which heavy loss are being expected in the coming near future.
I want to ask you whether you will compensate for the loss or Mr. Yogi Adityanath Ji will compensate for the same.

So I request you to put kind attention on the same and give orders to your workers to do the proper work and close all the sewage properly with cemented structure where there they had opened it for the fittings of pipelines.

Await for your kind response!!!

Thanks
Ghanshyam Chaturvedi
Email: [email protected]

TIKONA DIGITAL NETWORKS Company can't shutting down my internet connection. they harassment only

Dear Sir,

I had written to the Tikona internet company that you have closed my internet connection and it has been done for 1 week. He has not stopped yet, knowingly being harassed I have also sent a request to him. But so far the company has not closed the connection. I am very worried. Tikona Company’s attitude is not right about the customer. my Tikona internet Cust. ID = 1117083245 Please help me with your help.

Please do the needful .
Viraj joshi

9404080076
nagpur.
==============